The Client who purchased Double wire Rod Breakdown machine from G.Y.M
On 18th May,2012, Jingsheng Group- Eastern Copper Recycled copper project commissioning ceremony was held in Economic and technologyical development zone of Linyi, Shandong province, Mr.Guan (General manager ) and Mr.Zhang (General Engineer) were invited to attend it.
The production line of capacity of 320 thousand ton copper alloy rod per year of this project has been put into trial production smoothly, this project focuses on the production of recycled copper, and has introduced the advanced technology of CCDR of Germany SMS Meer GmbH, then the Rod will be further processed to produce standard 2.6mm rod with the Double wire Rod breakdown machine with continuous annealer and coiler manufactured by G.Y.M. Presently. Currently, the Eastern Copper has been the largest production base of recycled copper in the north area of Yangtze River.
Client’s success means the success of G.Y.M. Before, the large copper processing industry was controlled by European Machinery, however, present, this situation has been changed, among the new projects of capacity above 150 thousand tons last year, xiangguang copper co, ltd, tongling nonferrous metal group holding co.ltd, Aluminum corporation of China etc has mainly used the machine of G.Y.M, and assisted with European machine. And Double wire Rod breakdown machine has been sold more than 10 sets since it was sold to Jin sheng Group which indicates the success of this model.